Frame­work de­ter­mi­na­tions (Lev­el 1)

A framework determination can, for example, set out the basic system for the future regulation of electricity and gas distribution and transmission system operators. A determination at this level describes the elements that such a regulatory system would need to have. Questions that could arise include:

  • How long is a regulatory period?
  • Is there individual efficiency benchmarking – for electricity and gas?
  • Is there a general sectoral productivity factor?
  • Is there an adjustment rule for certain types of costs (permanently non-controllable costs, capital costs)?
  • Are there still special rules for small network operators, similar to the simplified procedure, and if so, which rules?

Proceedings

Details of proceedings of the Grand Ruling Chamber for Energy for framework determinations

Opening of proceedings on the determination of a regulatory framework and methods for incentive regulation for electricity and gas distribution system operators and gas transmission system operators (RAMEN) [GBK-24-01-3# 3]
Determination proceedings of the Grand Ruling Chamber for Energy for provisions on the setting of network tariffs to be charged for access to the hydrogen core network and on the establishment of a payback mechanism effective for a certain period (WANDA) [GBK-24-01-2#1]

Please note: the links may be to pages or documents available only in German.